The Jordon Group’s Retail Design Consultant Roddy Brooks managed the project, working closely alongside owner Baz Jethwa from start to finish. This was an extensive £400k refurbishment which we are very proud to say was finished on time and within the budget set. The most technologically advanced, energy efficient equipment was used, including leading Italian Refrigeration manufacturers, Arneg Refrigeration. Energy efficient, air conditioning, compressors and lighting were used throughout the entire project, keeping costs and environmental impact to a minimum. Intrac’s AMX 35 shelving was used for quality, durability and ease of manoeuvre, and a bespoke counter designed and installed.
- - Farnworth, Bolton, Lancashire
- - November 2016
- - Complete Fit-out
“I couldn’t praise the Jordon Group enough – The decision to choose the team to complete our project wasn’t just based on a great price, we had seen lots of previous jobs that they had completed and they were all highly admirable. From the second the quotation was completed everything was taken care of – the whole project was thoroughly organised and we had absolutely no worries as Roddy had thought of every minor detail in the process to ensure an extremely smooth running. From the tiling through to the ceiling and signage everything was completed to a very high standard."